A Kassem, M, Khoiry, M A and Hamzah, N (2020) Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27(09), 2767–93.

Adabre, M A and Chan, A P (2020) Towards a sustainability assessment model for affordable housing projects: the perspective of professionals in Ghana. Engineering, Construction and Architectural Management, 27(09), 2523–51.

Ahmadu, H A, Ibrahim, A D, Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(09), 2199–219.

Akanmu, A, Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(09), 2577–90.

Almatroushi, H, Hariga, M, As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: an integrated approach. Engineering, Construction and Architectural Management, 27(09), 2135–61.

Amos, D, Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: a developing country perspective. Engineering, Construction and Architectural Management, 27(09), 2715–35.

Chiu, W Y B and Lai, J H (2020) Building information modelling for building services engineering: benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(09), 2221–52.

Edwards, D J, Rillie, I, Chileshe, N, Lai, J, Hosseini, M R and Thwala, W D (2020) A field survey of hand–arm vibration exposure in the UK utilities sector. Engineering, Construction and Architectural Management, 27(09), 2179–98.

Farajmandi, M, Ali, M, Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(09), 2615–41.

Hsu, P, Aurisicchio, M, Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(09), 2501–22.

Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(09), 2661–86.

Liu, H, Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction – method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(09), 2409–27.

Liu, J, Cui, Z, Feng, Y, Perera, S and Han, J (2020) Impact of culture differences on performance of international construction joint ventures: the moderating role of conflict management. Engineering, Construction and Architectural Management, 27(09), 2353–77.

Luo, L, Zhang, L and He, Q (2020) Linking project complexity to project success: a hybrid SEM–FCM method. Engineering, Construction and Architectural Management, 27(09), 2591–614.

Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: a qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(09), 2429–49.

Maqsoom, A, Hamad, M, Ashraf, H, Thaheem, M J and Umer, M (2020) Managerial control mechanisms and their influence on project performance: an investigation of the moderating role of complexity risk. Engineering, Construction and Architectural Management, 27(09), 2451–75.

Moon, S, Ham, N, Kim, S, Hou, L, Kim, J and Kim, J (2020) Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building. Engineering, Construction and Architectural Management, 27(09), 2271–86.

Nasirzadeh, F, Kabir, H D, Akbari, M, Khosravi, A, Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(09), 2335–51.

Sezegen, A and Edis, E (2020) Product innovation types: a discussion considering building facade products. Engineering, Construction and Architectural Management, 27(09), 2379–408.

Sinoh, S S, Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: a Malaysian case study. Engineering, Construction and Architectural Management, 27(09), 2737–65.

Tran, D H (2020) Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(09), 2287–313.

  • Type: Journal Article
  • Keywords: Multi-objective analysis; Social group optimization; Multi-criteria decision; Time-cost tradeoffs; Scheduling;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-08-2019-0412
  • Abstract:
    Project managers work to ensure successful project completion within the shortest period and at the lowest cost. One of the main tasks of a project manager in the planning phase is to generate the project time–cost curve, and furthermore, to determine the most appropriate schedule for the construction process. Numerous existing time–cost tradeoff analysis models have focused on solving a simple project representation without regarding for typical activity and project characteristics. This study aims to present a novel approach called “multiple-objective social group optimization” (MOSGO) for optimizing time–cost decisions in generalized construction projects.Design/methodology/approach In this paper, a novel MOGSO to mimic the time–cost tradeoff problem in generalized construction projects is proposed. The MOSGO has slightly modified the mechanism operation from the original algorithm to be a free-parameter algorithm and to enhance the exploring and exploiting balance in an optimization algorithm. The evidential reasoning technique is used to rank the global optimal obtained non-dominated solutions to help decision makers reach a single compromise solution.Findings Two case studies of real construction projects were investigated and the performance of MOSGO was compared to those of widely considered multiple-objective evolutionary algorithms. The comparison results indicated that the MOSGO approach is a powerful, efficient and effective tool in finding the time–cost curve. In addition, the multi-criteria decision-making approaches were applied to identify the best schedule for project implementation.Research limitations/implications Accordingly, the first major practical contribution of the present research is that it provides a tool for handling real-world construction projects by considering all types of construction project. The second important implication of this study derives from research finding on the hybridization multiple-objective and multi-criteria techniques to help project managers in facilitating the time–cost tradeoff (TCT) problems easily. The third implication stems from the wide-range application of the proposed model TCT.Practical implications The model can be used in early stages of the construction process to help project managers in selecting an appropriate plan for whole project lifecycle.Social implications The proposal model can be applied to multi-objective contexts in diversified fields. Moreover, the model is also a useful reference for future research.Originality/value This paper makes contributions to extant literature by: introducing a method for making TCT models applicable to actual projects by considering general activity precedence relations; developing a novel MOSGO algorithm to solving TCT problems in multi-objective context by a single simulation; and facilitating the TCT problems to project managers by using multi-criteria decision-making approaches.

Tran, D Q, Harper, C M, Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(09), 2163–78.

Viswanathan, S K and Jha, K N (2020) Risk mitigation modelling of international construction projects executed by Indian firms: a structural equation modelling approach. Engineering, Construction and Architectural Management, 27(09), 2687–713.

Wang, P, Wu, P, Wang, X, Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(09), 2109–33.

Wu, J, Liu, H J, Sing, M C, Humphrey, R and Zhao, J (2020) Public–private partnerships: implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(09), 2253–69.

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(09), 2315–33.

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(09), 2553–76.

Zhang, H, Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(09), 2643–59.

Zhang, S B, Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(09), 2477–500.